Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | TAPM0605 |
Functions | Punching, marking, shearing |
Angle size (mm) | ∠35×35×3~∠56×56×6(Q235) |
Max. Punching (dia. х thi.) (mm) | Φ26 |
Punching force (kN) | 150 |
Marking force (kN) | 630 |
Shearing force (kN) | 300 |
Max. length of blank workpiece(m) | 10 |
Max. length of finished workpiece(m) | 5 |
Punches per side | 1 |
Group of marking character | 4 |
Character qty. in each group | 12 |
Dimension of letter (mm) | 14x10x19 |
CNC axes | 3 |
Cutting mode | Single blade cutting |
Feeding speed of angle (m/min) | 80 |
Programming mode | Lofting software or manual program |
Overall size(mm) | 20000×4000×2200 |
Net weight(kg) | About 10000 |
Total power(KW) | About 17 |
Working conditions: | ||
Working environment: | Working temperature: | -10ºC ~ 40ºC |
Voltage: | 380V(±5-10%), 50Hz, 3 Phase | |
Air supply: | 1 MPa |
No. | Name | Brand | |
Main Electric Components | |||
1 | PLC | Japan YOKOGAWA | |
2 | Servo Motor | Japan YASKAWA or PANASONIC | |
3 | Servo Driver | ||
4 | Business Computer | China Lenovo | |
5 | Photoelectric Switch | AUTONICS | |
6 | Low-voltage electrical parts(Switches,Push button, Breaker,Indicator light, Contactor switch and so on) |
SIEMENS | |
7 | Proximity Switch(N.O) | AUTONICS | |
8 | Proximity Switch(N.C) | AUTONICS | |
9 | Power Supply | China Aerospace | |
Main Hydraulic Components | |||
1 | Hydraulic Valves | Italy ATOS | |
Main Mechanical Components | |||
1 | Linear Slide | HIWIN | |
2 | Ball Screw | HIWIN | |
Main Pneumatic Components | |||
1 | Punching Unit | Padding Block Cylinder | Taiwan AirTAC |
2 | Magnetic Switch | Taiwan AirTAC |
No. | Name | Material | Qty. | Remark |
1 | Punch head (Ф13.6, Ф17.6) |
T10A | 4 | Including installed in machine |
2 | Cavity die (Ф14,Ф14.3, Ф18,Ф18.3) |
T10A | 8 | Including installed in machine |
3 | Upper blade | 9CrSi | 2 | Including installed in machine |
4 | Nether blade | 9CrSi | 3 | Including installed in machine |
5 | Punching mould | ZG45 | 3 | Including installed in machine |
6 | Punch head pole | T10A | 3 | Including installed in machine |
7 | Punching screw nut | 40Cr | 3 | Including installed in machine |
8 | Upper claw | T10A | 2 | Including installed in machine |
9 | Nether claw | T10A | 2 | Including installed in machine |
10 | Character box | T10A | 5 | Including installed in machine |
11 | Character(numbers+letters) | T10A | 2 sets | Including installed in machine |
12 | Proximity switch | Normal open | 1 | AUTONICS |
13 | Proximity switch | Normal close | 1 | AUTONICS |
14 | Photoelectric switch | 1 | AUTONICS | |
15 | O ring + Combination pad | 1set | ||
16 | Inner hexagon spanner | 1 set | ||
17 | 300mm adjustable spanner | 1 | ||
18 | 150mm Screwdriver (- /+) | 2 | ||
19 | Spanner for punch head | 1 | Manufacturer made | |
20 | Spanner for double nipple | 2 | Manufacturer made | |
21 | Standby paint | 1 pail | ||
22 | Operation Manual | 2 sets |
Installation Preparation |
1. Installation time required for one set CNC angle line: 3-7 days. |
1.1 The buyer should make ready foundation of machine according to the foundation drawing sent from our side. Please note, the foundation base plates for machine are not supplied by us. The buyer should make them according to drawing requirements. 1.2 Number 46# anti-wearing hydraulic oil, appx. 800L. 1.3 Oil filter is required before infuse oil into hydraulic oil tank. 1.4 Power supply and incoming line should be 50Hz, 380V, three phase. The coming line can be cable or lead wire of 3*102mm. And prepare earth wire of 62mm. 1.5 Air supply is required the air compressor also required for machine. 1.6 Leveling instrument (three legs type). 1.7 Frame level meter. 1.8 Five meter length tape measure. 1.9 Straight rule of 200mm., 1.10 L-square. 1.11 Welding machine for spot weld foundation base plate. 1.12 Traveling crane or moveable forklift. 1.13 Hand drill. 1.14 Three people help to install machine. |
2. Commissioning time required: 1-3 days. |
2.1 Two operators, one maintainer. Arrange some people to accept training. They have to stay with our engineers during installation, commissioning and training. 2.2 Material for testing machine. |
3. Training time required: 5 days. |
It is better that the people who accept training can know computer and electrical knowledge. |
Remark1:Water Cooling Device If the temperature of oil is too high, density of the oil becomes smaller, and affecting normal operation of machine, and even causing oil leakage, so the oil need cooling device, the best way of cooling for oil is water cooling, client just need to weld one water tank (size about: 2x1.5x1.8m, this size just for reference, picture as below:), when you welded the water tank, buy one pump (Requirements of the pump: power more than 0.5KW, pump head 10m, if bigger it's better, picture for reference as below:) |
The main machine | |
The machine is made up of six parts, including loading part, feeding part, main unit, unloading part, hydraulic drive part and electric controlling part. |
Easy Programming Methods |
Work piece program is input into computer according with the drawing dimension of work piece and some rules to make it can be identified by computer. |
Several symbols are explained as follows: (1)P----It refers to specification of angle, for example ∟100×10 angle steel. (2) M----The element of the material of the angle, for example: Q235A, 16Mn. (3)LP----The length of the work piece. (4)SA SB----Refers to the width of two wings of the angle steel. (5) TA TB----Refers to thickness of two wings of angle steel. (6) X----Refers to the distance from center of the hole to front edge of angle steel. Its short name is end distance. (7)XI----Refers to the distance between the current hole and the hole of last row at the program at X axis direction. (8) TR---Refers to the stadia (edge distance) of the hole. (9)DA DB----Refers to the diameter of holes in both A side and B side. (10)PP----Refers to the same diameter of holes. Namely, the distance among near holes with the same edge distance. (11)RP----Refers to the same diameter of holes. Namely, count by of holes with the same distance among them and with the same edge distance. (12) MK----Refers to marking. (13)M30----Refers to program finish. (14)END----Refers to files finish. |
Programming Citing: Example:
|